Topic
procurement
Every Plug & Go High Voltage article tagged procurement, gathered in one place for procurement and engineering teams researching this topic.
Articles in this topic
- SF6-Free Switchgear in Offshore Turbines: What the EU 2028 Deadline Means for Dropper Cables
The EU F-gas rules phase out SF6 in 66kV-class switchgear from 2028. What that means for dropper cable interfaces, procurement and testing.
- Dropper Cable After-Installation Testing: What to Specify Before Energisation
Factory tests prove the assembly left the plant intact. Here is what to specify for after-installation testing of dropper cables before a turbine is energised.
- Dropper Cable Bend Radius: Reading the Spec Before You Plan the Route
Minimum bend radius sounds like one number. For a dropper cable it's at least two, and mixing them up is how routing plans fail on site.
- Factory Acceptance Testing: What to Require From a Dropper Cable Supplier
A five-item checklist for what a dropper cable factory acceptance test report should actually contain, beyond a datasheet pass/fail stamp.
- Siemens Energy and Siemens Gamesa Are Becoming Omterra
Siemens Energy's move to unify with Siemens Gamesa under Omterra is a naming change, not an engineering one — here's what procurement teams should verify.